Projects
Some of our current and recent construction projects include:


Click any image to enlarge
Student Services & Administration Building
Construction of this 46,000-square-foot facility began in the summer of 2013 and is expected to be completed in late 2014.


Click any image to enlarge
Institute for Culinary Education
A groundbreaking for this 12,000-square-foot culinary arts education building was held Aug. 19, 2013. It is expected to be completed in late 2014, with occupancy in early 2015.

Library Expansion
The 51,435-square-foot Library expansion began in August 2011 and was completed in September 2012. Above, The Learning Center (TLC) now occupies a significant portion of the expanded building's first floor.

Mentry Hall Expansion
A 30,000-square-foot expansion of Mentry Hall was completed in 2010.



Dr. Dianne G. Van Hook University Center
The 110,000-square-foot center opened in late 2009 and was dedicated Jan. 30, 2010. The center houses multiple advanced-degree programs from public and private universities, allowing students to attain bachelor's and master's degrees without leaving the Santa Clarita Valley.

Canyon Country Campus
The 70-acre campus in Canyon Country opened in 2007. The first permanent building, the Applied Technology Education Center, opened in 2011.

Aliso Hall & Lab
Two new science buildings providing 32,000 square feet of classrooms, labs and lecture halls opened in 2007.

Hasley Hall
The 58,348-square-foot High-Tech Classroom Building opened in 2007.

Pico Canyon Hall
The 19,762-square-foot Music/Dance Building opened in 2005.

Performing Arts Center
The Santa Clarita Performing Arts Center at College of the Canyons opened in 2004. The center includes two performance areas: the Main Stage, which can accommodate upwards of 900 people, and the Black Box Theater, a smaller, more intimate venue that can be configured in various ways and accommodate approximately 100 guests..

construxupdateheader
Construction Update
A detailed periodic update of campus construction projects. Click any of the files below to download a PDF version of that month's newsletter.
Viewing these files requires a PDF reader such as Adobe Reader or Mac OS X's Preview application.


Resources
Educational & Facilities Master Plan
The Educational & Facilities Master Plan charts the college's progress and plans for the future. Because it is such a large document, the report has been divided into three parts that can be downloaded separately:
Chapters 1 & 2 (13.3 MB)
Chapter 3 (4.6 MB)
Chapter 4 (27.9 MB)
scccdsealwhiteknockout2

VALENCIA CAMPUS
26455 Rockwell Canyon Road, Santa Clarita, CA 91355
(661) 259-7800
 
CANYON COUNTRY CAMPUS
17200 Sierra Highway, Santa Clarita, CA 91351
(661) 362-3800
 
Copyright © 2013 by College of the Canyons. All rights reserved.
 
item1b1
Facilitiesscccdsealwhiteknockout1item3fitem3a1item3b1item3c1item3d1item3e1item3e1a1Projects
Some of our current and recent construction projects include:


Click any image to enlarge
Student Services & Administration Building
Construction of this 46,000-square-foot facility began in the summer of 2013 and is expected to be completed in late 2014.