November 16, 2001 INFORMATION: Sue Bozman or John McElwain, (661) 362-3415 or 3494
Performing Arts Center Groundbreaking Slated Dec. 10
A groundbreaking ceremony for the college's much-anticipated Performing Arts Center has been scheduled for Dec. 10; watch for future announcements of time and location. Once work begins, the project will take approximately 18 to 24 months to complete.
The center is a joint effort between College of the Canyons and the City of Santa Clarita, which is contributing money to increase the capacity of the main performance hall to 950 seats.
A smaller "black box" theater also will be incorporated into the structure, allowing more intimate, experimental productions.
The center will take architectural and visual clues from the college's library, most notably in its curved, two-story wall of glass (see artist's rendering). The Performing Arts Center will be built on the northern side of the existing main entrance driveway off Rockwell Canyon Road and just east of the Student Center.
|